Prepare the van.
Resolve the shortage.
We connected the dispatch desk to an assembly reference and the parts needed for the visit.
The selected valve gives the shortage a specific object, rather than leaving the operator with an unexplained warning.
Explore the work ↓- PROJECT TYPE
- Interface design & front-end development
- DOMAIN
- Parts readiness and van stock workspace
- DESIGN FOCUS
- Showing parts shortages before dispatch
Dispatch depends on the missing part.
The shortage chain carries the release prerequisites into a revised visit. We kept proposed recovery separate from a ready van so the new date would not hide the missing material. The technical composition lets the operator inspect the component and its operational consequence together.
The pages we designed.
The build brings dispatch readiness, j–402 work pack, van inventory, shortage dependency review and stock movements into one workspace.
J–402 work pack
View the screen ↓Van inventory
View the screen ↓Shortage dependency review
View the screen ↓Stock movements
View the screen ↓Project scope.
We designed and built 5 pages for this self-initiated project, including the layouts, responsive behaviour and front-end interactions. The interface uses sample business records.
The screenshots show authored interface states. Live accounts, operational integrations and production transactions are outside this portfolio build.
The gallery shows our rendered pages with identifying details masked.
A closer look.
Page by page.
Start with the overview, then explore the details. These are screenshots of the original interface, with names, contact details and identifying information blurred for privacy.
5 views Select any view to exploreHave a similar project?
Let’s discuss the work.
Tell us what your customers or team need to do. We can help define the pages, records and interactions around that task.




