Dispatch readiness
We connected the dispatch desk to an assembly reference and the parts needed for the visit.
View the screen ↓
We connected the dispatch desk to an assembly reference and the parts needed for the visit.
The selected valve gives the shortage a specific object, rather than leaving the operator with an unexplained warning.
A technician can have a work pack and still lack the parts needed to complete the visit. Dispatch readiness needs to expose that dependency.
The shortage chain carries the release prerequisites into a revised visit. We kept proposed recovery separate from a ready van so the new date would not hide the missing material. The technical composition lets the operator inspect the component and its operational consequence together.
The build brings dispatch readiness, j–402 work pack, van inventory, shortage dependency review and stock movements into one workspace.

We connected the dispatch desk to an assembly reference and the parts needed for the visit.
View the screen ↓
Assembly identification only. Follow the approved site work pack for operating procedures.
View the screen ↓
Physical stock, reservations and availability · Devon Reed.
View the screen ↓
Riley recorded the shortage before dispatch. The existing two-valve reservation stays in place; inbound stock has not been posted.
View the screen ↓
One of the three issued kits was not used. Actual consumption is two; future job reservations are not additional stock movements.
View the screen ↓Explore the interface, from the first impression to the finer details.
Choose a view to enlarge ↓Tell us what your customers or team need to do. We can help define the pages, records and interactions around that task.