Narrow the selection.
Search, category, finish and in-stock filters operate on the shared product records.
A trade ordering interface that brings product specifications, pack rules and project schedules into the purchasing workflow.
We built FIELDWORK around architectural hardware orders. Buyers can move from a product and its drawing to a project list, adjust quantities and inspect the order calculation.
Finish, selling unit, pack size and supply status all matter before a buyer confirms a quantity.
We used shared product records across the catalogue, detail page, quick order and saved lists. That keeps prices and product information consistent as the buyer moves between screens.
The catalogue has six SKUs, with search, filters and sorting. The detailed product page adds specifications and a downloadable drawing; the order screen gives quantities and fulfilment preferences more room.
Five screens separate account activity, product research and order preparation.

Search, category, finish and in-stock filters operate on the shared product records.

Account price, quantity controls and an original drawing sit beside the product details.

Pack rules, stock warnings and calculated totals stay close to the line items.

Three project schedules retain product selections, quantities and procurement notes.
We applied multiples of two to hinges and pulls, and multiples of one to lever sets. The order interface rejects an odd hinge quantity rather than silently rounding it.
Supply is a separate concern. The 224 mm pull is marked as backordered, so a valid quantity can still have a stock warning. We kept these states distinct: one concerns the order format, the other concerns fulfilment.
The default four-line project order totals AUD 4,316.00 before the example tax calculation. The interface adds AUD 431.60 and displays a product total of AUD 4,747.60.
We label delivery separately because it is unpriced. The displayed product total should not look like a final delivered quote. Project reference and fulfilment preference accompany the lines so the request has purchasing context.
Navy navigation, warm work surfaces and monospaced product codes give the portal a technical character without crowding the ordering tables.
The catalogue, product, order and project lists reuse the same data.
The quantity checks distinguish an invalid increment from a stock warning.
Product subtotal, example tax and delivery exclusion appear separately.
Explore the interface, from the first impression to the finer details.
Choose a view to enlarge ↓We build trade interfaces around your product data, selling units and purchasing process.