One supplier quotes $4,000. Another quotes $11,000. Both proposals say “website redesign.”
These are invented quotations for comparison, not market prices. The point is what the words can conceal.
The first supplier may be restyling existing templates while you supply finished content. The second may be replacing the CMS, rewriting pages, moving a library of articles and testing several integrations. Comparing the totals before comparing those responsibilities tells you very little.
Open the cheaper proposal at the exclusions
Look for the work somebody still has to do.
“Content supplied by client” could mean writing the text, choosing images, obtaining permissions, entering the pages and checking them after migration. If your team expected to approve copy rather than produce it, the project has an unpriced gap.
“Existing integrations retained” is similarly ambiguous. Does it mean the supplier will test them, repair incompatibilities or simply leave the old code in place?
Write each responsibility in a separate line. Give that line an owner. Do this before negotiating the number.
THE IDEA, ILLUSTRATED
Two proposals can describe different projects
Count page types, then count the content
A twenty-page site may use four layouts. A five-page site may include a customer account, appointment booking and a bespoke pricing tool.
Ask for two inventories:
| Inventory | What it tells the estimator |
|---|---|
| Distinct templates and interactions | Design and implementation work |
| Content records, media and URL changes | Entry, migration and verification work |
Neither replaces the other. A reusable article template is one implementation task; moving and correcting two hundred articles is another.
Ask the supplier to inspect a sample of the old content. Broken formatting, inconsistent metadata and missing image rights do not disappear because the proposal calls migration “included.”
The migration is where a redesign becomes a different project
Keeping useful URLs reduces unnecessary change. When a URL must move, identify its relevant replacement.
Google's site-move guidance recommends preparing a URL map. Budget time for that map, updated internal links and production verification. “Redirect everything to the homepage” is not an adequate substitute.
Also inventory what URLs do: campaign destinations, downloads, enquiry forms and external booking links. A page can look correct while sending requests to the wrong place.
If you change the domain, CMS and design together, ask the supplier to separate the verification work for each. Otherwise a failure after launch can become a dispute about which change caused it.
QUICK REFERENCE
Compare the scope behind the price
| Work | Question both suppliers must answer |
|---|---|
| Content | Who writes, enters and approves it? |
| Templates | How many distinct interactions are included? |
| Migration | Which records, media and URLs move? |
| Integrations | What will be tested and repaired? |
| Handover | What accounts and instructions are delivered? |
Build a side-by-side scope comparison
Enter the two quoted amounts, then mark what each proposal says about the required work. The tool counts required packages that are not explicitly included and exports the comparison. It does not estimate the price of missing work or declare a cheaper proposal better.
A WORKING TOOL
Compare the promises behind the prices.
Mark each work package using the written quotation. Uncheck Required only when that work is unnecessary for your project.
Request a revised quote using this paragraph
Please separate design, content, development, migration and verification. State the distinct templates, the number of content records included, the integrations you will test and the revisions covered. Identify our responsibilities, exclusions and change-request triggers. Include source-code and account handover, plus the process for post-launch defects.
This does not force every supplier into hourly billing. It makes fixed prices comparable.
A supplier may sensibly request paid discovery before committing to uncertain integrations. Ask what discovery will deliver: a tested dependency, a defined scope or a prototype answering a named question. “We will understand the project better” is too vague.
Keep a cash budget beside the project price
Record the deposit, later payments, licence purchases, hosting changes and any period of overlapping services. A quoted build total does not tell the finance team when money leaves the account.
Set aside an uncertainty allowance tied to actual unresolved work. There is no magic contingency percentage that fixes an unknown migration. Investigating a sample can be more useful than adding another percentage.
For post-launch expenditure, use the website maintenance cost article. It covers ownership and operating responsibilities rather than another rebuild estimate.
We can help define the redesign at the template, content and workflow level through web engineering, with search visibility work informing URL and content decisions. Book a free 30-minute appointment and include the current site and the changes you are considering. We can discuss what needs scoping before a dependable quotation, even if you have not settled the page count.
The quote you want is the one whose assumptions still make sense when the project becomes difficult.